Completion of studies and preparation of tender documents for the variation of the railway line alignment between Iasmos – Polyanthos (A.D. 237.1), including 8.64 km of railway line and 9.27 km of secondary roads. OSE S.A., final railway and road design, hydraulic works studies, structural design, cadastral survey, cadastre, environmental study, Health & Safety file. 2024-today: 227,348€
Financing, Operation, Maintenance and Exploitation of Egnatia Odos Motorway and Three Vertical Road Axes, TERNA S.A. a. Final Design (road, drainage, signage, safety, minor structures, etc.) for 20 new Motorists’ Service Stations (M.S.S.) 2023-today: 250,000€ b. Final design of the Lateral Toll Stations of Pedini I/C (branches 3 & 4), West Siatista I/C (branches 1 & 2) and Ionia I/C (branches 3 & 4) 2023-today: 94,400€ c. Review and evaluation of Structures Studies and new complementary Structure Studies (Bridges etc.) at the upgraded Vertical Axes Α1 and Α25 of the Egnatia Odos (DENCO Structural Engineering P.C. – GTB ANODOS S.A.) 2023-today: 618,500€
Design support of PPP agreement for the construction of the North Roadway of Crete (Study, Construction, Financing, Operation and Maintenance of Chersonisos – Neapoli Section, Highway, Signing, Structures, Drainage and water management), Contractor TERNA S.A. – AKTOR A.T.E. – INTRAKAT S.A. 2023-today: 661,500€
4. On-call Technical Support, Financing, Upgrade, Maintenance, Management and Operation of the Regional Airports of Crete, Continental Greece and Ionian, FRAPORT Regional Airports of Greece A S.A. a. Touch Down Zone (TDZ) markings amendment designs for CFU, EFL & ZTH – PAPI & Aiming point relocation designs for PVK & CFU 2023-today: 27,780€ b. Traffic surveys for ZTH and KVA airports 2023-2023: 51,475€
On-call Technical Support, Financing, Upgrade, Maintenance, Management and Operation of the Regional Airports of Aegean, FRAPORT Regional Airports of Greece B S.A. a. TDZ markings amendment designs for JMK, JSI, KGS, MJT, RHO, SMI – PAPI & Aiming point relocation designs for JTR, JSI & MJT airports 2023-today: 38,340€ b. Traffic surveys for MJT, SMI and JSI airports 2023-2023: 68,700€ c. Preliminary study for RHO Ga/Ba Lounge 2023-2024: 29,190€ d. Airside and Landside (north side) Basic & Support studies for the JTR expansion project 2023-2023: 62,700€
Financing, Upgrade, Maintenance, Management and Operation of the Regional Airports of Crete, Mainland and Ionian – traffic study 2022 for SKG, CFU, EFL, PVK & CHQ airports, FRAPORT Regional Airports of Greece A S.A. 2022-2022: 143,175€
Financing, Upgrade, Maintenance, Management and Operation of the Regional Airports of Aegean – traffic study 2022 for RHO & KGS airports, FRAPORT Regional Airports of Greece B S.A. 2022-2022: 67,175€
RWY Strip adaptation design and services for EASA compliance to upgrade the operational safety of airport infrastructure at Kos (KGS), Kerkyra (CFU), Skiathos (JSI), Aktio (PVK), Rhodes (RHO), Zakinthos (ZTH) – aeronautical studies, geometrical design of STRIPS & RESA, topographic survey, hydraulic design, construction phasing & risk assessment, INTRAKAT 2021-today: 247,400€
Concession Agreement: Central Greece E65 Motorway and New Public Sections (PATHE) (Northern Deferred sections of E65 Motorway), TERNA S.A. a. Final highway, hydraulics and structural designs for ch. 111+500 to ch. 136+000 2021-today: 379,000€ b. Final highway, hydraulics and structural designs for ch. 136+000 to ch. 148+111 2021-today: 300,000€ c. Final structural designs (underpasses, culverts) for ch. 148+111 up to EGNATIA ODOS Interchange at ch. 181+598 2023-today: 120,140€
Flood protection designs at Central Greece Motorway (E65) areas at West Thessaly catchment from Anavra to Trikala, hydraulic, road, structural, survey, J/V CENTRAL GREECE MOTORWAY E65 a. Kalentzis catchment: R. Kalentzis and R. Karambalis training and relevant works b. Pamisos catchment: flood protection works at R. Pamisos and tributaries c. Enipeas catchment: flood protection works from ch. 0+000 to ch. 61+500 2021-today: 1,338,179€
Survey designs in parts of Central Greece Motorway (E65) at West Thessaly catchment from Anavra to Trikala, J/V CENTRAL GREECE MOTORWAY E65 2021-2021: 140,000€
Masterplan for the flood protection of West Thessaly (1st phase) at areas of Central Greece Motorway from Anavra to Trikala, J/V CENTRAL GREECE MOTORWAY E65 2021-2022: 200,000€
Survey design a) Igoumenitsa – Sagiada – Mavromati ch. 10+500 to 19+543, b) r. Kalama at ch. 7+200, Igoumenitsa – Sagiada – Mavromati section (30.02) of the vertical axis, Igoumenitsa – Sagiada – Mavromati / Igoumenitsa bypass of Egnatia Odos – ref. num 5810, EGNATIA ODOS S.A. 2020-2021: 47,725€
Technical consultant services to the Airport Infrastructure Directorate for studies required for the tender: Expansion, refurbishment and improvement of Chios Airport OMIROS building and E/M facilities and construction of a new E/M substation and signage station building, AIRPORT, GREEK MINISTRY OF INFRASTRUCTURE AND TRANSPORTATION / INFRASTRUCTURE DIRECTORATE (D15) 2020-2022: 41,512.50€
Construction of new, upgrade-repair of existing artificial barrier and relative projects along the Greek-Turkish border in Evros Regional Unit (road works, geotechnical studies, survey and structural design), JV AXAX S.A. – INTRAKAT – MYTILINEOS S.A. – TERNA S.A. 2020-2021: 133,929€
Concession Agreement: Design – Construction – Financing – Operation – Maintenance and Exploitation of Heraklion Crete New International Airport & Design – Construction and Financing of Road Connections, TERNA S.A. 2019-today: 988,182.76€
Technical Consultant services for the Airport Infrastructure Directorate for the studies for the tender: “Expansion-improvement of maneuvering area of Chios Airport OMIROS and related projects”, AIRPORT, GREEK MINISTRY OF INFRASTRUCTURE AND TRANSPORTATION / INFRASTRUCTURE DIRECTORATE (D15) 2019-2020: 136,800€
Provision of consulting services for “Financing, Operation, Maintenance and Exploitation of Egnatia Odos Motorway and Three Vertical Road Axes”, Consortium “GEK TERNA S.A. – EGIS PROJECTS S.A.” 2018-2021: 50,000€
Design Works and Services Agreement for the design works of the Landside area of Cluster B Regional Airports in Greece according to Fraport Regional Airports of Greece S.A. (Fraport) Agreement, Contractor: INTRAKAT S.A. 2017-2022: 250,000€
Design Works and Services Agreement for the design works of the Airside area of Cluster B Regional Airports, according to Fraport Regional Airports of Greece S.A. Agreement, Contractor: INTRAKAT S.A. 2017-2022: 372,960€
Surveying and Digital Mapping of the existing sewer network of EYDAP S.A. for the Ilioupoli area for Final Support Facilities Services 2017-2019: 30,000€
Detail design of buildings (structural) and surrounding area (road, drainage, planting/irrigation for eight (8) Motorists’ Service Stations (M.S.S) along IONIA ODOS, NEA ODOS S.A. 2016-2018: 198,000€
Design Rehabilitation Works and Services Agreement for the Old National Road between Evangelismos IC to Leptokarya I/C, 33.0km. Road Safety Audit/Inspection, Road Design Improvement, traffic management, signing-safety, roundabouts, traffic studies, Contractor: Maliakos Kleidi JV. 2016-today: 314,800€
Completion of studies and preparation of tender documents for the variation of the alignment of the railway line between Paranesti – Stavroupoli, 34 km of railway & 10 km of secondary roads. OSE S.A. Land Surveying, final railway, road, hydraulic, structural design of 33 bridges, 1 tunnel & 1 Cut & Cover, cadastre, tender docs. 2015-2018: 1,235,122€
Design works and services for the Tempi Frontal Toll Station in the Old National Road. Design of buildings and canopies (structural), site layout (road, drainage, planting/irrigation): Aegean Motorway S.A. 2014-2017: 95,500€
Design of road safety improvement measures for Xanthi Prefecture Road Network, including 250km of Rural bidirectional Roads: Egnatia Odos S.A. 2014-2016: 28,000€
Studies for the 2nd phase for standardization & upgrading of the existing railway line Patras – Pyrgos – Alfeios – Olympia, 2nd section: R.S. Kavasila – Olympia & Pyrgos – Katakolo, 76 km railway, 18 km of secondary road, ERGA OSE S.A. 2013-2016: 708,400€
Design of Ionia Odos from end of Concession to Kakavia, 46.4 km motorway with 6 interchanges & local road network restoration, Ministry of Public Works. Survey, highway, hydraulics & structures, cadastre. 2007-2011: 2,248,600€
Design-Construction-Financing-Operation-Maintenance and Exploitation of the Central Greece Motorway (E65). MOTORWAY CENTRAL GREECE E-65 JV: a. Section 3. Ch. 61+000–131+000, 70 km, 6 interchanges, local roads. Survey work, detailed design (highway, drainage, 8 bridges, 17 overpasses, 24 underpasses, 120 culverts), traffic, toll design (Sub-contractors TERNA, FERROVIAL, DRAGADOS). b. Section 4. Ch. 136+000–144+000, 8 km, 1 interchange. Drainage design (Sub-contractor DRAGADOS). c. Toll station construction at Skarfeia–Raches section of PATHE. Survey, cadastre, detailed design (roadworks, structures), traffic, signage (Sub-contractor TERNA). 2008-2011 & 2014-2017: 4,055,400€
Design-Construction-Financing-Operation-Maintenance and Exploitation of the motorways Ionia Odos (Antirrio–Ioannina), PATHE (Athens–Maliakos), PAThE connecting branch (Schimatari–Chalkida). Contractor EUROIONIA JV: a. Section 2. Ch. 76+618–129+626, 53 km, 2 interchanges, service roads. Survey, detailed design (road, hydraulic, 11 bridges, 14 overpasses, 47 underpasses, 128 culverts in Sections 1 & 3), traffic, tolls (sub-contractors TERNA, DRAGADOS). b. Toll Plazas construction in PATHE (ATH–Maliakos) and Schimatari–Chalkida. Detailed design (highway, structures). Contractor EUROIONIA JV. c. Section 1. Ch. 36+940–43+502, 7 km, service roads. Road, hydraulic design, cadastre (sub-contract FERROVIAL). d. Toll Plazas, Agrinio bypass, 34 km. Road, hydraulic, structures, traffic, (sub-contract TERNA). 2007-2011 & 2014-2017: 2,896,600€
Studies for the new railway line Siatista-Kastoria, 46.8 km, OSE S.A. Complete road and hydraulic design, topography, preliminary design of 59 bridges, 2 Cut & Cover & 2 pile-walls. 2006-2011: 1,883,800€
Design-Construction-Financing-Operation-Maintenance & Exploitation of PATHE Motorway, Maliakos-Kleidi Section, GU15: Rapsani-Pyrgetos, 6 km. Contractor MALIAKOS KLEIDI JV. Final design: planting, irrigation, E/M pumping station, SCADA, structure. 2011-2011: 31,000€
Ionia Odos motorway, section Ag. Dimitrios – Sellades bypass of Arta – Filippiada, 9 km (incl. service roads, Arta IC), Contractor ELTER S.A. (prefinal, final, detailed highway design, signage and traffic management). 2006-2010: 338,700€
PATHE Motorway, Stylida – Raches, 19 km (incl. interchanges/service roads): a. Contractor ATTI-KAT S.A. (detailed highway, hydraulic, small structures, traffic). 2007-2009: 337,000€ b. Contractor AKTOR S.A. – TERNA S.A. JV (cadastre, detailed highway/hydraulic, structures, traffic). 2013-2015: 307,400€